INSTALLATION INSTRUCTIONS

Step 1:      Sub Floor Preparation

Creative Options can be installed in new construction (Concrete, OSB, Plywood) as well as over existing flooring that has been secured to the subfloor (vinyl, linoleum, ceramic tile, hardwood installed above grade).
  • Subfloor must be flat, solid, smooth, clean, dry and free of dust. Any deficiencies such as cracks or gouges in the subfloor must be filled with a cement-patching compound before installation. Subfloor must be level to within 1/8″ every 10ft. Moisture testing is a mandatory step of subfloor preparation. For concrete subfloors the maximum allowable moisture is 80RH, using Insitu probe, and the Calcium Chloride test – 5lb/1000sf per 24hrs MVER (Moisture Vapor Emissions Rate). Concrete PH must be between 5 to 9. New concrete must be cured for a minimum of 28 days prior to installation. All wood substrates including plywood, OSB and existing hardwood must be moisture tested and read below 11%.
  • Maintain a room temperature between 18°C (64.4°F) and 29°C (85°F) during and after installation. Creative Options can be installed over radiant heated flooring with a maximum allowable heat of 27°C (80°F). The heating system must be in operation for at least 3 weeks prior to installation. Once installation is complete the heat can be gradually increased until it reaches the desired temperature.
  • Skim coat ceramic tile grout lines with a floor-leveling compound before installation.
  • Latex floor primer can be used over concrete and wood subfloors. Primer can provide additional bonding for approved adhesives and double faced tape.

Do Not Install Over

  • Multiple layers of previous flooring
  • Cushion backed resilient flooring
  • Subfloor that has been adapted or contains alkali


Step 2:      Getting Ready For Installation

  • Creative Options must be acclimated to room temperature between 18°C (64.4°F) and 29°C (85°F) for 48 hours prior to installation. To ensure best results, remove the top of the carton allowing airflow into the carton, but do not remove product from box.
  • Measure room to ensure the length and width of your first row of planks is within tolerance - keeping in mind the starting/ending row planks must be at least 2" wide. If this cannot be achieved when starting with a full plank, the first row must be cut to accommodate the last row.
  • Planks running perpendicular to perimeter walls must be a minimum of 6" long. It is recommended that cut planks are joined factory end to factory end with the cut side facing a perimeter wall.


Step 3:      Choose Your Installation Method

 
  • Perimeter Lock Method
    Suitable for residential applications (See Installation Guide below for more details). Recommended adhesives are Armstrong S-288 (permanent adhesive) or Armstrong S-289 (pressure sensitive adhesive). Double faced tape can be used in small rooms.
  • Full Spread Method
    Suitable for all installation types. Required for commercial applications. Recommended adhesives are Armstrong S-288 (permanent adhesive) or Armstrong S-289 (pressure sensitive adhesive).


Step 4:      Time to Start Installing

Tools required:  Utility Knife / Straight Edge / Measuring Tape

   1.      Perimeter Lock Method (P.L.M.) Installation

  • Following the adhesive manufacturer's application requirements, apply a 6-10" strip of adhesive around the perimeter of the room. Place your first row on top of the adhesive ensuring the planks are tight to corner and adjoining walls.
  • It is highly recommended that planks be glued down when transitioning to other rooms (i.e. Doorways, Hallways). Additional adhesive should also be used in areas that are susceptible to movement, such as - near large appliances. Areas that are exposed to large amounts of direct sunlight should also be glued down.
  • Be creative with the preceding rows. Cut your first plank (minimum 6") so that subsequent full planks are loose laid in a staggered formation. End joints should also be a minimum of 6" apart. Planks can be cut by scoring the top layer or with the use of a vinyl floor cutter.
  • To navigate around irregular objects, trace and cut a pattern around them using heavy paper, trace the same pattern onto the plank and cut along traced lines with a utility knife.
  • Finish by dropping in final row of planks ensuring a tight fit has been achieved against all surrounding walls. To ensure a proper bond, the entire installation should be rolled in both directions with a 100lb roller.

   2.      Full Spread Method (F.S.M.) Installing

  • Follow the adhesive manufacturer's installation instructions. Planks must be installed tight to perimeter walls. Planks should be staggered to achieve the best visual effect. When installing in heavy commercial traffic areas, or applications with heavy rolling loads, the entire floor must be adhered with a suitable adhesive such as Armstrong S-288.

PERIMETER LOCK METHOD

FULL SPREAD METHOD

RESIDENTIAL APPLICATIONS

COMMERCIAL APPLICATIONS

HYDRONIC HEATED FLOORS

STAIRWAYS / LANDINGS

MOISTURE PRONE AREAS

(kitchens, bathrooms, laundry rooms)